LLMSkillHub
mirroredCopied from osovv/grace-marketplace under MIT. osovv has not claimed this page, and is not affiliated with LLM SkillHub.

osovv / grace-plan

Read an approved GRACE 4 GraceChangeSpec and optional design context, then create a GraceChangePlan with assertions, scopes, tasks, and verification gates.

0
SKILL.md
3.8 KB

<skill>
<purpose>Convert one approved active GraceChangeSpec into the executable GraceChangePlan; do not implement source code.</purpose>

<inputs>

  • Required: .grace/changes/active/C-CHANGE-ID/spec.xml
  • Optional: sibling design-context.xml
  • Current state: .grace/context, graph and verification indexes, and their routed documents

</inputs>

<preflight>

  • Require .grace/changes/active/C-CHANGE-ID/spec.xml with GraceChangeSpec, status approved, and exactly one matching direct C-* wrapper.
  • Refuse draft, rejected, cancelled, applied, or superseded specs.
  • Treat optional design-context.xml as explanatory; spec.xml wins on conflict.
  • Run grace lint --path PROJECT --assertions current before planning and surface stale or invalid active baselines.

</preflight>

<approvedplanimmutability>

  • If plan.xml already exists with status approved, stop before writing.
  • Do not refresh BaselineAssertions, TargetAssertions, DurableScope, ObservedWriteScope, or tasks in place.
  • Create a new C-* bundle and mark the old bundle superseded with an explicit replacement reference.

</approvedplanimmutability>

<must_do>
Produce plan.xml from references/change-plan-template.xml as draft unless the user explicitly approves the completed plan. Require a matching C-* wrapper, meaningful intent, non-empty machine-checkable baseline and target assertions, explicit durable and observed scopes, and unique acyclic T-NNN tasks. A scope with no writes must use an explicit <None /> marker; prose such as "none" is invalid. Every task has one Title, one DependsOn element listing zero or more predecessors as canonical comma-separated T-NNN values (for example <DependsOn>T-001, T-002</DependsOn>), non-empty acceptance criteria, and non-empty verification commands. Dependencies form a directed acyclic graph: list only true predecessors and never linearize independent tasks into a chain to express ordering. Surface stale-state and coexistence warnings, and reject unsupported scope glob syntax instead of guessing.
</must_do>

<commandphaserules>

  • current is an active-baseline preflight and is valid only before observed writes begin.
  • baseline is the selected pre-edit gate, target is selected post-edit evidence, and final is the outer apply/archive gate owned by grace-execute.
  • MustPassCommand contains leaf project evidence such as tests, typecheck, build, format, or package checks. Never place grace lint, grace status, or another GRACE lifecycle command inside it.
  • Never put --assertions current in TargetAssertions or in task verification that runs after writes. Use selected target/final lint externally instead.
  • A MustPassCommand must complete within its declared budgetSeconds (absent, the global --command-timeout applies) on the reference host; declare the budget you have measured rather than inheriting a default that will kill the command mid-gate.
  • A whole-suite command whose runtime is dominated by substrate startup — containers, databases, browsers, emulators — belongs in an acceptance tier, not in the gate; never declare both a whole-suite command and the file-level commands it already re-runs.

</commandphaserules>

<validation>

  • Active-baseline preflight: grace lint --path PROJECT --assertions current
  • Parallel safety: grace lint --path PROJECT --parallel-preflight
  • Recommend grace status --path PROJECT --json after approval.

</validation>

<hard_rules>
Do not implement code, silently approve a plan, overwrite an approved plan, or mutate current graph/verification artifacts while planning. Semantic anchors are canonical XML tags, never attributes.
</hard_rules>
</skill>