LLMSkillHub
mirroredCopied from GanyuanRan/Aegis under MIT. GanyuanRan has not claimed this page, and is not affiliated with LLM SkillHub.

ganyuanran / long-task-continuation

Use when a task is multi-step, may span context resets or sessions, uses subagents, or risks losing state before completion.

0
SKILL.md
9.5 KB

Long Task Continuation

Overview

Keep long work checkpointed, resumable, drift-aware, and evidence-gated. This
protocol does not execute plans, dispatch subagents, run tests, or grant
completion authority.

Authority Boundary

The Method Pack owns continuation discipline only. It does not own the parent
plan, host retry/watchdog behavior, authoritative GateDecision, evidence
sufficiency, requirement acceptance, or completion.

When To Use

Use this skill when the work has meaningful phases, may be compacted/resumed or
handed off, uses subagents, or explicitly needs continuity and drift control.
Architecture, contract, shared-workflow, and verification-gate changes also
benefit from it. Do not force it onto a short answer or one-command check.

Choose exactly one state carrier:

  • within this continuation workflow, use a durable work/ record for
    medium/high work, or for work of any complexity that actually crosses
    sessions, needs handoff, or requires resumable state;

  • otherwise keep one inline checkpoint.

Multi-step, todo-driven, possible-compaction, and subagent use do not force
durable records for low-complexity work by themselves. Do not create both carriers or a record per
slice.

Required Artifacts

A durable task has one process trail under
docs/aegis/work/YYYY-MM-DD-<slug>/. It keeps logical intent/baseline state,
the latest todo/checkpoint/resume state, terminal evidence/drift state, and a
completion reflection when warranted. These are
TaskIntentDraft, BaselineReadSetHint, BaselineUsageDraft,
ImpactStatementDraft, TodoCheckpointDraft, ResumeStateHint,
DriftCheckDraft, and EvidenceBundleDraft views—not authoritative runtime
records or separate plan owners.

Read only the lifecycle-matched section of durable-work-guidance.md:

  • ## Required Artifact Layout and ## Create A Durable Work Record for a new durable work record;
  • ## Update A Slice when an existing helper-backed record needs sidecar updates;
  • ## Retry Convergence Detail for retry/attempt bookkeeping;
  • ## Pause, Handoff, And Completion Bundle when preparing a pause, handoff, or completion bundle; and
  • ## Expanded State Fields only when natural checkpoint prose is ambiguous.

The reference owns artifact layout and <aegis-workspace-helper> command
detail; this file owns carrier selection, resume order, drift decisions, and
stop conditions.

An Execution Readiness View may be kept in the intent or active checkpoint
for medium/high, handoff-prone, long-running, subagent-driven, architecture,
contract, compatibility, or retirement-sensitive work. It renders existing
intent, scope, baseline, owner, test, review, and drift constraints; it is not a
new JSON artifact or completion authority.

Planless Slice Lane:

  • When an existing parent plan/spec owns a bounded task, reuse it and the
    current checkpoint. For a no-parent direct bounded request with no new
    durable or unclear verification boundary, use an inline checkpoint.

  • State one compact Slice Card: Goal, Parent plan/spec (or
    none — direct bounded request), Files, Boundary, Verification, and Stop.

  • The slice goal closes only that slice. Final completion returns to the parent
    or direct bounded request through verification-before-completion.

  • Do not create a plan/spec merely to give a micro-slice a parent, and do not
    create per-slice plans/specs or work records.

  • Escalate when a new owner, contract, schema, public API, architecture,
    migration, persistence, security/permission, distribution/release surface,
    unclear verification boundary, or mismatch with parent scope or acceptance
    appears.

When durable architecture decisions are in scope, these work records are the
preferred ADR Auto Backfill source. Preserve decision signals, source refs,
alternatives, compatibility, retirement, drift, and baseline-sync questions.

Start Protocol

Before execution:

  1. Capture requested outcome, scope, non-goals, risks, parent plan/goal, success
    evidence, and stop states (`done | blocked | needs-verification |
    scope-exceeded`).

  2. Identify required baseline refs and record acknowledged, cited, and missing
    refs. Missing authority pauses in needs-baseline-readback.

  3. Choose inline or durable state once, then record the todo map, active slice,
    completed slices/evidence, blockers, next step, and current branch/HEAD.

  4. When an Execution Readiness View exists, retain its intent lock, scope
    fence, baseline lock, compatibility/retirement boundary, tests, reviews,
    evidence, and rewind rules.

  5. For a new helper-backed record, use durable-work-guidance.md to create and
    structurally check it before implementation.

Retry Convergence Protocol

A failed verification is another attempt in the current slice, not a new
slice. Keep failed-attempt telemetry out of terminal evidence and normal
commits. Only evidence-finalized, blocked, or abandoned is terminal.
When retry state reaches process-artifact-pressure, stop auto-retry and route
to systematic-debugging or verification-before-completion. Load the durable
reference only when the attempt/evidence commands or sidecar rules are needed.

Per-Slice Protocol

Before each slice, state the current goal/todo, intended edits, explicit
non-edits, verification, and readiness alignment. A bounded parent-plan or
no-parent slice uses the compact Slice Card rather than a new plan/spec.

After each slice, update completed todos, evidence refs, newly used baseline
refs, blockers, next step, and drift decision. When an active helper-backed work record exists, read durable-work-guidance.md and update that same record;
never create another workstream for bookkeeping.

When patch-shape/ripple triage, an H-class finding, or a bounded compatibility
mitigation fired, a locally green result does not clear the direction. Retain
PatchShape, CanonicalOwner, UpwardDrillSignal, latest outcome, and one
bounded evidence ref; do not copy raw logs or full diffs. If no fresh evidence
exists, the state is needs-verification or partial.

Resume Protocol

Resume in this order:

  1. Read original intent, parent plan/goal, latest checkpoint and resume hint.
    Reconcile current user instructions: continuation, amendment, pause, or
    replacement. Preserve outstanding deliverables; update authorized scope
    before treating a valid amendment as drift. Internal milestones are not
    substitutes for the user's delivered result.

  2. Re-read required baseline refs and relevant active CONTEXT.md language.
  3. Read the Execution Readiness View when present.
  4. Compare checkpoint branch/HEAD, completed commits, evidence refs, and claims
    with the current worktree.
    Treat inherited completion claims as unverified until the worktree confirms
    them. Correct contradictions in the checkpoint, disclose them in the final
    report, and do not republish stale claims as current.
    Preserve the claim's subject, scope and resume-time state; distinguish that
    from later repair and from historical execution you cannot verify. One
    accurate correction may cover related claims. The record must adopt it,
    without elsewhere denying it or assigning it to another scope. A reviewer's
    classification is contestable: if material disagreement remains unresolved
    after checking evidence, retain needs-verification without forcing assent.
    If evidence resolves it, retain the supported conclusion and verify normally.

  5. Compare the active slice against intent lock, scope fence, baseline lock,
    compatibility/retirement boundary, tests, reviews, and non-goals.

  6. Re-run the drift decision, then name the next smallest authorized action.

Any disagreement among plan, checkpoint, baseline, context, readiness view, or
worktree pauses execution. A semantic conflict routes to
establishing-project-context; an unplanned repair re-reads the retained
invariant, owner seam, patch shape, and causal topology, then route comparison to
systematic-debugging. A new carrier name alone does not prove a new direction. Never resume from memory alone.

Drift Check

Check original intent and stop condition, parent scope/acceptance, compatibility,
new owners/fallbacks/adapters/branches, retirement, evidence freshness, and any
readiness locks. Allowed decisions are continue, pause-for-user,
needs-baseline-readback, needs-verification, and blocked.

Never emit gate-passed, completion-granted, or authoritatively-safe.

Completion Candidate Protocol

Before a completion claim:

  1. Use aegis:verification-before-completion.
  2. Confirm every todo has status, blockers are resolved/externalized, evidence
    covers acceptance, and drift has no blocking state.

  3. If a durable record exists, load durable-work-guidance.md for the completion
    bundle and structural workspace check.

  4. For durable architecture work, pass the work record, proof bundle and ADR signals
    to verification for ADR Backfill Check.

Generated packs are future-runtime inputs only. Method Pack output remains
verified evidence and advisory judgment, not authoritative completion.

Minimal Reporting Shape

Report naturally and omit empty structures. Keep these semantic slots visible:
Aegis Visibility; current todo/active/completed/next; baseline usage decision;
readiness state when present; fresh evidence; inherited-claim corrections when
a resumed record overstated its state; retry/convergence state when
relevant; drift decision; risk/unknown; and the next smallest safe action.